Monday, 27 March 2017

Weybread Weir dried out

The automated sluice control at the main face of Weybread Weir is out of action so the main drop is dry:

Which means the river bed is dry below the weir, looking upstream from the footbridge

or downstream from the bridge

All of the water is going over the old lock sluice, just possible as a bump and scrape with a serious lean back...

It was nice to get a decent look at the structure

close to